Home Sessions
Click here to view Session Plan
13 Feb 2025 - Main Auditorium
13 Feb 2025 - Cafeteria
Theme Paper
GM, NTPC
Green hydrogen for Grid Balancing, 2029-30
Principal Chief Engineer, Central Electricity Authority
RISK-INFORMED APPROACHES TO OPTIMIZE ASSET MANAGEMENT APPROACHES
Technical Executive, Electric Power Research Institute
Energy Transitioning with CCUS: Experience sharing of World’s Unique CO2 to Methanol Project at NTPC Vindhyachal
General Manager, NTPC
13 Feb 2025 - Sankalp Hall
Bulge Wagon Auto Detection System
Deputy General Manager, NTPC Bongaigaon
Enhancement of safety during overhauling by a change in planning of permits
NTPC LIMITED, B.Tech
Safety in Power Plants - FirePro Condensed Aerosol System
Managing Director, Indian Institute of Science Education and Research
Improving Behavior Based Safety through the concept of Safety Acts Index
AGM(Safety), NTPC
13 Feb 2025 - Siddhi Hall
A DIGITALIZATION ROADMAP AND METHODOLOGY FOR ASSET MANAGEMENT EXCELLENCE
Technical Executive, EPRI International
Process Optimization and technological upgrades for Flexibility to ensure safe, reliable, and sustainable operations
Director, Intertek
CENTRALIZED C&I ASSET MANAGEMENT SOLUTION FOR NTPC USING OPEN-SOURCE TOOLS
Senior Manager, C&I, NTPC Ltd.
Study on applicability and scope of AI and Data Analysis Tools for Optimization of Maintenance Practices for Capital Equipments in Thermal Power Plant
Mr., DGM-EMD
Ensuring long-term reliability of Boiler
Senior Manager, Boiler Maitenance, Senior Manager, BMD, NTPC Telangana
Enhancing Boiler Reliability: Strategies to Prevent Condensate Blocking in Pendent Coils
Maintenance engineer, Senior Manager, Boiler maintenance department
A Case Study on Failure of Finish Super Heater Tubes in Boilers at NSTPS
Sr.Manager, Sr. Manager, NTPC LTD, NSTPS
BTL Reduction Through Skill Development and Identification Scheme (S-DAIS) for IBR Welders
DGM- FIELD QUALITY ASSURANCE, NTPC LIMITED
Boiler Tube Leakage: A persistent Challenge - Unfolding strategic solutions for reliability
Dy Manager, NTPC Ltd
Water Management in Power Plant
Sr. Manager, None
WATER MANAGEMENT IN MEJIA THERMAL POWER STATION- a Case Study
Environment Management & Pollution Control, Damodar Valley Corporation
Sustainable Generation – Closing on the Crucial Water Linkage
Addl.General Manager, NTPC Limited
Production of ‘Green DM Water’ by using waste heat recovery- An innovative, sustainable, economic approach for conserving natural resources
MANAGER, NTPC SIMHADRI
Strategies for Reducing Evaporation Loss in Power Plant Operations: A Path to Sustainable Water Management
DGM (OPERATION), NTPC Ltd
Enhancing Power Plant Reliability in India_ The Critical Role of Performance Testing for Boilers and Steam Turbines
Senior Vice President of McHale & Associates, Inc., ASME Member & Serves for various ASME PTC codes
Improvement in Cooling Tower Performance at NTPC Farakka: A Case Study on Identifying and Mitigating Defects in Cost Effective Manner
Sr Manager, NTPC Farakka
AdvX® system for thermal power plant efficiency improvement and Heat management
Director Technical, Arvos Ljungstrӧm LLC
TOOL FOR DIGITAL FURNACE TEMPERATURE MAPPING AND USING AIML TO PREDICT FURNACE TEMPERATURE WITH THE AVAILABLE REAL-TIME
MANAGER, ADANI POWER LIMITED ,KAWAI
Important Factors for Better Condenser and Cooling Tower Performance
Vice President -Technical Services, Ion Exchange India Limited
Load Restrictions on account of very high TG Bearing temperatures due to slope/catenary abnormalities in 800MW TeSTPP units after initial operations.
Senior Manager, Sr. Manager , MM-TMD, NTPC Telangana
Dry Cooling System in thermal Power Plants – Need of the hour, challenges and Way forward
AGM, Group head (PE-Mech-II) NTPC EOC SECUNDERABAD
Addressing Steam Turbine Maintenance Challenges under Flexible Operation
DGM, NTPC
A Case Study on Failure of Stellite-6 Coating on Turbine Valve Plugs after Short-Term Operation.
Sr Manager, NTPC Limited
NTECL U#1 TURBOGENERATOR REVIVAL CASE STUDY
DGM, NTPC Ltd
Flexible Operation & Reliability Challenges for LP Turbines
Executive, EPRI
UNIT CONTROLS PERFORMANCE MONITORING DASHBOARD FOR STEAM PARAMETER ANALYSIS
SENIOR MANAGER, SENIOR MANAGER
Implementation of Artificial Intelligence for Identification of Weld Joint defects during Overhauling & Boiler Tube Failures
Senior Manager, NTPC LTD
Building Machine Learning-Based Model for Large Induction Motor based Drives in a Typical Thermal Power Plant
DGM(IT), Deputy General Manager (IT), NTPC Dadri
Digital Initiatives for Plant Load Adjustment in auto to minimize the impact of DSM Regulations
DGM Operation, Nabha Power Limited
AI based Wireless condition monitoring System for Take up pulleys of CHP conveyors
Sr.Manager, NTPC
IoT & AI for efficient and flexible operation of thermal power plant for energy transition
Assistant Director, International Collaboration, Japan Carbon Frontier Organization (JCOAL)
Unit-3 Turbine Restoration – Experience & Learning of Koldam Hydro Power Station
Turbine Restoration – Experience & Learning, NTPC ltd
A presentation on CFD Study of Water Conductor System along with under water parts of 4X50 MW Kopili Power Station KHEP, NEEPCO Ltd
CGM, NEEPCO
FROM OBSTACLES TO OPPURTUNITIES: SMALL HYDRO’S PATH TO OPTIMISED PERFORMANCE
Senior Manager, NTPC Ltd.
Innovative Gas Turbine Maintenance Practices at NTPC Dadri Gas
AGM, NTPC Dadri (Gas), IEEE (Power & Energy Society)
Leveraging AI and Operational Data for Enhanced Predictive Maintenance in Power Plants: A Case Study
Future of Gas based Generation in India
Gas Based Power Plant - Cyclic & Flexible Operations -Present & Future
Dy. Engineer, Gujarat State Electricity Corporation Ltd.
14 Feb 2025 - Main Auditorium
Methodology for Prioritizing Investments in Flexible operation of coal Plants for Sustainable Grid Operations
Assistant Director, Central Electricity Authority
OPERATIONAL FLEXIBILITY OF THERMAL POWER PLANTS: INSIGHTS FROM RAMAGUNDAM UNIT 7 LOW LOAD TESTS
Chief Advisor, COWI
From Stability to Flexibility- Thermal Power Plant Adaptations for Renewable Integration
Counsellor, Confederation of Indian Industry
Boiler Flame Failures in Flexible Operating Regime – Operational optimisation
Addl General Manager, NTPC milited
Complete Cycle Solution
Global Head of Marketing, ARNOLD
14 Feb 2025 - Sankalp Hall
Implementation of Remote Racking of MV Breakers by Integrated Motorized Mechanism
DGM-Electrical, STATION ENGINEERING, NTPC EMPLOYEE
STRATEGIES TO ACHIEVE ZERO FORCED OUTAGE OF KUDGI THERMAL UNITS DUE TO ELECTRICAL SYSTEM
DGM, Mr
Rectification of High Temperature Issue in Segmented Isolated Phase Bus Ducts – A Case Study of 2 X 800 MW Ultra Super Critical Thermal Power Plant
Manager, Adani Power Jharkhand Limited
Generator Performance Under Flexibilization: Challenges and Mitigation Approaches
From Vibration Anomalies to Generator Integrity: A Methodical Approach to Troubleshooting
Sr. Manager, BHARAT HEAVY ELECTRICALS LIMITED
14 Feb 2025 - Siddhi Hall
A Novel Approach to Managing Air Cooled Condenser Corrosion and Enhancing Reliability
REVERSE OSMOSIS – A PROVEN TECHNOLOGY IN WATER TREATMENT YET INTRICACIES IN ITS OPERATION - LEARNINGS OF REVIVAL OF RO PLANT AT NTPC TELANGANA
DGM CHEMISTRY, NTPC
Chemistry Management in Ultra Supercritical Boiler at Godda of Adani Power
DGM Head Chemistry APJL, Adani Power Jharkhand Ltd
Strategies to Maintain the Integrity of Boilers and Turbines by Preventing Corrosion and Deposition in Current Operational Scenarios
Senior Manager (COS-Chem), NTPC Ltd.
A New Acid Cleaning Method for removal of Hard Silicate Scale deposit in Condenser tubes of U#2 of Dhariwal Infrastructure limited 2x300 MW plant
Chief Manager Chemistry, Head of Chemistry Dhariwal Power plant
14 Feb 2025 - Cafeteria
Dry Ash Evacuation Process Improvement- "Advance Pulse Jet Timer System (A-PJT)" [In-House designed and Developed at NTPC-SSTPS]
Advanced Process Control Deployment with No Black Box Solution
DGM CC OS CST GROUP, NTPC LTD
Reduction in Rake Detention Time through Automation Control Techniques
DGM, Nabha Power Limited
ADVANCED SLURRY DENSITY MEASUREMENT: TECHNOLOGY AND TECHNIQUES FOR INDUSTRIAL APPLICATIONS
DGM C&I MAINTENANCE, NTPC Limited Nabinagar
UPGRADATION OF OWS/SERVERS /NAS -PERFORMANCE AND AVAILABILITY BY REPLACEMENT OF HDD WITH SSD
DGM, NTPC LIMITED
Operation and Control Philosophy of Rapid Loading System in NTPC Pakri Barwadih Coal Mines
THE CHALLENGES AT NTPC- MOUDA ATTRIBUTABLE TO HIGH DEMURRAGE ON ACCOUNT OF UNDERUTILIZATION OF WAGON TIPPLER#1: A CASE STUDY
SENIOR MANAGER, CHP-MECHANICAL MAINTENANCE, NTPC
EFFECTIVE COAL STOCKYARD MANAGEMENT TO MEET CHALLENGE OF HANDLING MULTIPLE QUALITY COAL
AGM -OS&E, GMR KAMALANGA ENERGY LTD
Best practices of CHP Maintenance to avert Monsoon challenges in the year 2024 ‘NTPC Ramagundam experience’
AGM, NTPC RAMAGUNDAM
Reliability Centred Maintenance of Wagon Tippler System for enhanced availability of coal unloading System: “A case study of NTPC Kudgi”
AGM (FUEL HANDLING - MECHANICAL MAINTENANCE), NTPC
“Sustainable Biomass Supply Network Model: A Pathway to Efficient Energy Transition”
Joint Director, Ministry of Power, Govt. of India (SAMARTH Mission
Municipal Solid Waste Cofiring in Pulverized Fuel Boilers :Sustainable Green Energy Transition Strategy
DGM ( CenPEEP), CenPEEP NTPC LTD
Nuclear for Viksit Bharat @2047
Sr. Mgr, NTPC Ltd
Enabling a Reliable, Decarbonized Future in a Variable Renewable Energy World
Optimizing Coal Fleet Performance to Accelerate the Energy Transition
CLIMATE CHANGE AND ENVIRONMENT MANAGEMENT IN OPGC
Sr. Manager (Environment), None
Ensuring a Sustainable Coal Mining and Supply for Thermal Power Plants: Beyond Environmental Compliance
Addl General Manager (Mining), NTPC Badam CMP
Exploring Business Opportunities in Biomass & MSW Torrefied Pellets in NCR
Executive Biomass, NTPC & SAMARTH, MoP, NTPC
Strategies for Smooth Commissioning and Stabilization of FGD Systems
SENIOR MANAGER, SENIOR MANAGER COS NTPC LIMITED
Net Zero for Power: A Roadmap for Energy Utilities
Manager, NTPC Limited
Optimizing Ash Handling Plant Operation from Ash Characteristics Measurable at Power Plant
Professor, Thapar Institute of Engineering & Technology
A Novel Approach in Operation and Maintenance Practices Ash Handling Plant (AHP) 4x600MW, JPL, Tamnar (C.G.)
Assistant General Manager, JindalPower Limited
Rare earth and critical elements in coal ash from various Indian power plants
Senior Principal Scientist, CSIR-CIMFR
Digital Transformation in Logistics Management for Ash Disposal in Coal Based Thermal Power Plant
Assistant Manager, Nabha Power Limited
STRENGTHENING THE ASH DYKE TOP ROAD USING GEOSYNTHETIC MATERIALS FOR ENHANCING THE ASH UTILIZATION
Senior Manager, Mr.
Performance Ratio Improvement of Solar Power Plant Using Re-Binning Technique
Renewable Energy, NA
TRANSFORMING INDIA’S ENERGY LANDSCAPE: ROLE OF ENERGY STORAGE IN RENEWABLE ENERGY INTEGRATION
Senior Manager, NTPC
Las Vegas to Leh – A holistic development approach of Ladakh through Renewable Energy, Agrivoltaic, Green Hydrogen & Energy Storage
TRANSFORMER DESIGNER, BHEL BHOPAL
Methanol Firing in Gas Turbines: A Sustainable Pathway for Renewable Energy Integration and Utilization of Gas Asset
NTPC, NTPC
Zerowatt Energy Intelligence system – An IoT & AI solution for increasing energy efficiency, reducing Auxiliary Energy Consumption, increasing profita
Chief Product Officer, Alphageek Enterprises private Limited
15 Feb 2025 - Main Auditorium
15 Feb 2025 - Sankalp Hall